Sponsored Projects
Sponsored Projects 2024-25
Sl. No. | Dept. | Name of the Principal Investigator/ Co-Investigator | Department of the Principal Investigator | Title of the Research Project | Name of the Funding Agency | Type (Government/Non-Government) | Funds provided (INR in lakhs) | Month and Year of receiving the grant | Duration of the Project |
---|---|---|---|---|---|---|---|---|---|
1. | CE | Dr. N. R. Krishnamurthy | CE | soil investigation for the construction of CMD Banglow, quaters, Vijayawada | AP Transco, Vijayawada | Government | 0.61 lakhs | July 2024 | 3 months |
2. | CE | Dr. Chava Srinivas, G Yashwanth | CE | Structural design of building | C R Rao Advanced institute of Matechematics, Hyderabad | Non-Government | 1.50 lakhs | July 2024 | 6 months |
3. | CE | Dr. N. R. Krishnamurthy | CE | Soil investigation for rest house building in the premises of TTDKM, Vijayawada | TTD, Vijayawada | Government | 0.41 lakhs | July 2024 | 3 months |
4. | CE | Dr. N. R. Krishnamurthy | CE | Soil investigation and load test – construction of elevated queue complex to the temple | Sri Durga Malleshwara Swamy Varla Devasthanam | Government | 0.93 lakhs | July 2024 | 3 months |
5. | CE | Dr. N. R. Krishnamurthy | CE | Construction of new boys hostel G+10 to vignan university, Vadlamudi | Prudhvi Consultants, Guntur | Non-Government | 0.70 lakhs | August 2024 | 3 months |
6. | CE | Dr. B. Pandurangarao and G. Nipun | CE | Structural stability analysis and NDT testing | Sir CR Reddy College, Eluru | Non-Government | 0.75 | November 2024 | 3 months |
7. | CE | Dr. B. Pandurangarao and G. Nipun | CE | Mix design for upcoming project | Juststrive Infrastructure Pvt. Ltd. | Non-Government | 0.61 lakhs | November 2024 | 3 months |
8. | CE | Dr. B. Pandurangarao and G. Nipun | CE | Mix design | Newgen tech concrete | Non-Government | 0.60 lakhs | November 2024 | 2 months |
9. | CE | Dr. B. Pandurangarao and G. Nipun | CE | Construction of boilers TG building etc. to KCP ltd. | Sathiapal Engineers Pvt Ltd | Non-Government | 0. lakhs 31 | December 2024 | 2 months |
10. | CE | Dr. N. R. Krishnamurthy and Dr.Ch. rama Vara Prasad | CE | Design of Ground improvement for construction of reinforecement earthen wall proposed for construction of road over bridge at gudivada, AP, india | Vallabhaneni constructions private limitted | Non-Government | 0.41 lakhs | January 2025 | 3 months |
11. | CE | Dr. V. Mallikarjuna | CE | Subsoil investigation at Postal Department site for construction of PO Building at Jubilee Hills, Hyderabad, Telangana State | Postal Department, Hyderabad | Government | 0.59 lakhs | January 2025 | 2 months |
12. | CE | Dr. N. R. Krishnamurthy and Dr.Ch. rama Vara Prasad | CE | Design of Ground improvement for construction of reinforeced earthen wall proposed for construction of 4 lane ROB at Km. 74/8-9 between Kaikaluru Pallevada Station on Gudivada | TrenZet Infra | Non-Government | 1.18 lakhs | March 2025 | 4 months |
13. | CE | Dr. G. V. Rama Subba Rao | CE | Geotechnical Investigation for construction of Pune Ring Road, Package – 4 Pune in the state of Maharashtra | Avani | Non-Government | 1.41 lakhs | March 2025 | 4 months |
14. | CE | Dr. Hanuma Kasagani and Dr. P. S. R. Ravi Teja | CE | Development of sustainable 3D mix Cementitious Material | Shree Cement Ltd. | Non-Government | 5.0 lakhs | March 2025 | 6 months |
15. | CE | Dr. Dr. G. V. Rama Subba Rao | CE | Site Characterisation and ground amelioration techniques for construction of various infrastructural facilities at Parnasala, Tarakaturu, A.P | Sri &Suri Investments | Non-Government | 0.75 lakhs | February 2025 | 2 months |
16. | CE | Dr. N. R. Krishnamurthy and Dr.Ch. Rama Vara Prasad | CE | Design of Ground Improvement for Construction of 2 – Lane ROB approaches at Km. 97/6-7 between Cherukuvada and Undi Station on Gudivada – Bhimavaram Station at NH Km: – 170+400 on NH-214 (2 Lane) in West Godavari District, A.P | TrenZet Infra | Non-Government | 1.80 lakhs | March 2025 | 6 months |
17. | CE | Dr. V. Mallikarjuna | CE | Subsoil investigation at Postal Department site for construction of HPO Building at Ramachandrapuram, Rajahmundry Division of Andhra Pradesh | Postal Department, Hyderabad | Government | 0.59 lakhs | March 2025 | 1 month |
18. | CSE | Dr. K. Keerthi | CSE | Generative AI and Responsible Innovation: Bridging Technology and Ethics | ANRF, DST | Government | 2.00 | May 2025 | 1 Week Sanctioned |
19. | CSE | Dr. K. L. Revathi | CSE | Generative AI: From Models to Real-World Impact | ANRF, DST | Government | 2.00 | May 2025 | 1 Week Sanctioned |
20. | CSE | Dr. Ch. Rupa (PI) | CSE | Design and Development of a Robust Authentication Protocol for Blockchain based Underwater Vehicles Secure Communication System | Advanced Manufacturing Institute, King Saud University, Saudi Arabia | international – Public and private university collaboration | SAR 30,000 | April 2025 | 1 Yr. Sanctioned |
21. | CSE | Dr. Ch. Rupa (PI) | CSE | Blockchain based Medical Digital Assets Protection Against Frauds | AICTE AURA | Government | 2.00 | March 2025 | 2 Yr. Sanctioned |
22. | CSE | Mrs. Ch. Raga Madhuri (Mentor), Student | CSE | Smart Irrigation Optimization with IoT and Weather Forecasts for Sustainable Crop Management | ANGRAU, Tirupathi | Government | 5.00 | March 2025 | 2 Yr. Sanctioned |
23. | CSE | Dr G. Anuradha (PI) | CSE | AI Enabled Framework for Monitoring Salinity Effected Soils in Coastal Andhra Pradesh Using Remote Sensing Data and Deep Learning Algorithms | ANRF-DST | Government | 22.40 | March 2025 | 3 Yrs. Sanctioned |
24. | CSE | Dr. Ravi Sankar P. (PI) | CSE | Frontiers of Quantum Computing | ANRF, DST | Government | 2.00 | December 2024 | 1 Week Completed |
25. | CSE | Dr. Ravi Sankar P. (PI), Dr. Keerthi K. (Co-PI) | CSE | Block chain enabled IoT Networks with AI Driven Automation Transforming Smart Eco-System for A Decentralized Future | AICTE ATAL FDP | Government | 1.00 | November 2024 | 1 Week Completed |
26. | CSE | Dr. Ashutosh Satapathy (PI) | CSE | Development of an IoT-enabled River Cleaning Robot for Removal of Floating Debris | AICTE AURA | Government | 2.00 | July 2024 | 2 Yrs. Sanctioned |
27. | CSE | Dr Ramesh Kumar P. (Mentor), Students | CSE | Geofence Livestock – Empowering Efficient Livestock Management Through Geofencing Technology | MSME Govt. of India | Government | 15.00 | March 2024 | 1 Yr. Ongoing |
28. | CSE | Dr. S. Vasavi, Dr. Rameshkumar P., Dr. D. Rajeswara Rao, Dr. KL Sailaja, Ch. Mukesh | CSE | Development of Edge Computing Framework for Multi-Object Detection Based on Deep Learning Techniques and Analysis for Satellite in Orbit Processing | ADRIN, ISRO | Government | 29.45 | February 2024 | 2 Yrs. Ongoing |
29. | CSE | Dr. S. Vasavi, Dr. M. Sobhana, Mrs. J. Malathi, Dr. K. Keerthi, Dr. T. Bindu Madhavi | CSE | Development Of Infrared Camera-Based Crowd Video Surveillance Using Hybrid Deep Learning Model | ADRIN, ISRO | Government | 32.93 | February 2024 | 3 Yrs. Ongoing |
30. | CSE | Dr S. Vasavi (Mentor), Students | CSE | Image Processing and Classification Techniques for Detection and Tracking of Whales Using Space-Borne Remote Sensing Data | IEEE GRSS | Non-Government | $6,000 | December 2023 | 1.5 Yr. Ongoing |
31. | CSE | Dr S. Vasavi (PI), Dr M. Sobhana (Co-PI) | CSE | Impact Of Climate Change on Offshore Wind and Wave Power Potential in the India EEZ Region | IIT Kharagpur AI4ICPS I Hub Foundation | Government | 23.22 | October 2023 | 2 Yrs. Ongoing |
32. | CSE | Dr S.Vasavi (PI), Mr N. Sunny (Co-PI) | CSE | Explainable Artificial Intelligence in Remotely Sensed Data: A Review of Applications and Current Research | IEEE GRSS | Non-Government | 4.05 | September 2023 | 1 Yr. Ongoing |
33. | CSE | Dr Ramesh Kumar (Mentor), Students | CSE | Aerator Automation and Monitoring System | IIT Hyderabad | Government | 1.00 | September 2023 | 1 Yr. Completed |
34. | CSE | Dr Ramesh Kumar (Mentor), Student | CSE | Quality Detection and Grading of Shrimps | IIT Hyderabad | Government | 1.00 | September 2023 | 1 Yr. Completed |
35. | CSE | Dr Ramesh Kumar (Mentor), Students | CSE | Mana Ration – Supply Chain Management Solutions | MSME Govt. of India | Government | 4.50 | June 2023 | 1 Yr. Ongoing |
36. | CSE | Dr S. Vasavi (PI), Dr M. Sobhana (Co-PI) | CSE | Updating Of Very Large-Scale Urban GIS Maps with Latest Very High-Resolution Satellite Data Using Deep Learning Techniques | NRSC ISRO | Government | 17.85 | June 2022 | 2 Yrs. Ongoing |
37. | CSE | Dr K. Srinivas (PI), Vani (Co-PI) | CSE | Qualitative And Quantitative Classification of Mixed Bamboo Forests Using Geospatial Technology | NESAC ISRO | Government | 25.30 | Sept 2021 | 3 Yrs. Ongoing |
38. | ECE | Dr.Venkata Sainath Gupta (PI), Dr. S. Vasavi (Co-PI), Dr. Gunnam Suryanarayana (Co-PI), Dr. K. Shri Ramtej (Co-PI), Mr. Partha Sarathi Nandy (Co-PI), Mr. Ameya Kesarkar (Co-PI), Mr. Raghav Mehra (Co-PI) | ECE | Development of Compressive Sensing Techniques for SAR Image Reconstruction | ISRO-RESPOND | Government | 18.17 | Dec 2024 | 2 Years (2024-2026) |
39. | ECE | Dr. Pratap Turimerla (PI), Dr. S. Vasavi (Co-PI), Mr. Bhaskar Dubey (Co-PI) | ECE | Development of Techniques for Scalloping and Banding Removal in Scan-SAR | ISRO-RESPOND | Government | 19.45 | Feb 2025 | 2 Years (2025-2027) |
40. | ECE | Dr. Moirangthem Santosh kumar Singh (PI) | ECE | Implementation of Characteristic Mode Analysis in Designing Miniaturized Implantable Antenna for Biomedical Applications | ANRF-Inclusivity Research Grant (IRG) | Government | 56.81 | Mar 2025 | 3 Years (2025-2028) |
41. | EEE | NIL | – | – | – | – | – | – | – |
42. | EIE | Dr. P Srinivas | EIE | Development, operation Generation of Reports in the Supply of Water to villages from the water treatment Plant through the PLCSCADA & wireless devices – Prototype | Microsys Automation | NON- Govt | 2 Lakhs | Nov 2024 | 2 years |
43. | EIE | Mr. V N Prudhvi Raj | EIE | Development of Handheld Portable Ultrasound Systems | Microsys Automation | NON- Govt | 2 Lakhs | Nov 2024 | 2 years |
44. | IT | Dr M Suneetha, Dr.V.Radhesyam, Dr.V.S.Sahithi | IT | Developing Efficient Local Scale Impact Evaluation tools using Geospatial System to Assess National Development Mission Outcomes and SDG Goals | National Remote Sensing Centre (NRSC-ISRO) | Government | 27,93,520/- | Sep 2022 | 03 Years |
45. | IT | Dr.J.Sateesh, Dr.G.Kalyani | IT | Design and experimental validation of a novel AI-powered artificial pancreas | Science and Engineering Research Board (SERB) DST | Government | 11,92,100/- | Jan 2024 | 03 Years |
46. | ME | Dr. B Supraja Reddy, Dr V Bala Krishna Murthy | ME | Development of a composite launch Tubes and Revalidation of a Composite Canister | Ramesh’s Aerospace Products & services Pvt. Ltd, Vijayawada | Non-Government | 3 | 09/2024 | 6 months |
Sponsored Projects 2023-24
Sl. No. | Dept. | Name of the Principal Investigator/ Co-Investigator | Department of the Principal Investigator | Title of the Research Project | Name of the Funding Agency | Type (Government/Non-Government) | Funds provided (INR in lakhs) | Month and Year of receiving the grant | Duration of the Project |
---|---|---|---|---|---|---|---|---|---|
1. | CE | Dr. G. Vinay Kumar | CE | Tracking the fluxes: Remote sensing of river discharge and suspended material deposits in coastal regions | SERB-TARE | Government | 18 lakhs | January 2024 | Ongoing |
2. | CE | Dr. N. R. Krishnamurthy | CE | Foundation solutions and design of Re construction of Sri Venkateswara Swamy Temple at Yanam in Puducherry, TTD Vijayawada | Sri Venkateswara Swamy Temple at Yanam in Puducherry, TTD Vijayawada | Government | 1.69 lakhs | February 2024 | 3 months |
3. | CE | Dr. B. Pandurangarao and V. Ramesh | CE | Proof checking of construction of prasadan laddu potu building (G+6F) in Sri Durga malleshwara swamy varla devasthanam, Indra keeladri, Vijayawada | CIST Infrastructure, Vijayawada | Non-Government | 2.36 lakhs | February 2024 | 3 months |
4. | CE | Dr. B. Pandurangarao and G. Nipun | CE | Concrete Mix design | Sri Lakshmi Ganapathi Infratech Pvt. ltd, Vijayawada | Non-Government | 0.52 lakhs | February 2024 | 2 months |
5. | CE | Dr. B. Pandurangarao and V. Ramesh | CE | Proof checking of construction of puja madapam in Sri Durga malleshwara swamy varla devasthanam, Indra keeladri, Vijayawada | CIST Infrastructure, Vijayawada | Non-Government | 0.75 lakhs | February 2024 | 2 months |
6. | CE | Dr. B. Pandurangarao and S. Satish | CE | Mix proposition for wet mix macadam, corporate office building, Gunadala, Vijayawada | Sukshetra infra projects pvt Ltd. | Non-Government | 0.70 lakhs | February 2024 | 2 months |
7. | CE | Dr. V. Mallikarjuna | CE | Subsoil investigation at Postal Department site for construction of PO Building at Jagannaikpur, Kakinada, under Kakinada Division of Andhra Pradesh – | Postal Department, Vijayawada | Government | 0.59 lakhs | March 2024 | 3 months |
8. | CE | Dr. B. Pandurangarao and G. Nipun | CE | Structural stability of girls and boys hostel building | Sir CR Reddy College, Eluru | Non-Government | 0.58 lakhs | March 2024 | 2 months |
9. | CE | Dr. V. Mallikarjuna | CE | Subsoil investigation at CPWD site for construction of Extension office Building at Tanguturu, Prakasam District of Andhra Pradesh | Postal Department, Vijayawada | Government | 0.26 lakhs | July 2023 | 1 month |
10. | CE | Dr. V. Mallikarjuna | CE | Subsoil investigation at CPWD site for construction of Godown at Podili, Prakasam District of Andhra Pradesh | Central Public Works Department, Ongole | Government | 0.35 lakhs | July 2023 | 1 month |
11. | CE | Dr. V. Mallikarjuna | CE | Subsoil investigation at CPWD site for construction of Annex Building at Kandukuru, Prakasam District of Andhra Pradesh | Postal Department, Vijayawada | Government | 0.26 lakhs | July 2023 | 1 month |
12. | CE | Dr. V. Mallikarjuna | CE | Subsoil investigation at Postal Department site for construction of HPO Building at Sattenapalli under Narasaraopet Division of Andhra Pradesh. | Postal Department, Vijayawada | Government | 0.59 lakhs | September 2023 | 4 months |
13. | CSE | Dr Ramesh Kumar P. (Mentor), Students | CSE | Geofence Livestock – Empowering Efficient Livestock Management Through Geofencing Technology | MSME Govt. of India | Government | 15.00 | March 2024 | 1 Yr. |
14. | CSE | Dr. S. Vasavi, Dr. Rameshkumar P., Dr. D. Rajeswara Rao, Dr. KL Sailaja, Ch. Mukesh | CSE | Development of Edge Computing Framework for Multi-Object Detection Based on Deep Learning Techniques and Analysis for Satellite in Orbit Processing | ADRIN, ISRO | Government | 29.45 | February 2024 | 2 Yrs. |
15. | CSE | Dr. S. Vasavi, Dr. M. Sobhana, Mrs. J. Malathi, Mrs. K. Keerthi, Dr. T. Bindu Madhavi | CSE | Development Of Infrared Camera-Based Crowd Video Surveillance Using Hybrid Deep Learning Model | ADRIN, ISRO | Government | 32.93 | February 2024 | 3 Yrs. |
16. | CSE | Dr S. Vasavi (Mentor), Students | CSE | Image Processing and Classification Techniques for Detection and Tracking of Whales Using Space-Borne Remote Sensing Data | IEEE GRSS | Non-Government | $6,000 | December 2023 | 1.5 Yr. |
17. | CSE | Dr S. Vasavi (PI), Dr M. Sobhana (Co-PI) | CSE | Impact Of Climate Change on Offshore Wind and Wave Power Potential in the India EEZ Region | IIT Kharagpur AI4ICPS I Hub Foundation | Government | 23.22 | October 2023 | 2 Yrs. |
18. | CSE | Dr S.Vasavi (PI), Mr N. Sunny (Co-PI) | CSE | Explainable Artificial Intelligence in Remotely Sensed Data: A Review of Applications and Current Research | IEEE GRSS | Non-Government | 4.05 | September 2023 | 1 Yr. |
19. | CSE | Dr Ramesh Kumar (Mentor), Students | CSE | Aerator Automation and Monitoring System | IIT Hyderabad | Government | 1.00 | September 2023 | 1 Yr. |
20. | CSE | Dr Ramesh Kumar (Mentor), Student | CSE | Quality Detection and Grading of Shrimps | IIT Hyderabad | Government | 1.00 | September 2023 | 1 Yr. |
21. | CSE | Dr Ramesh Kumar (Mentor), Students | CSE | Mana Ration – Supply Chain Management Solutions | MSME Govt. of India | Government | 4.50 | June 2023 | 1 Yr. |
22. | CSE | Dr S. Vasavi (PI), Dr M. Sobhana (Co-PI) | CSE | Updating Of Very Large-Scale Urban GIS Maps with Latest Very High-Resolution Satellite Data Using Deep Learning Techniques | NRSC ISRO | Government | 17.85 | June 2022 | 2 Yrs. |
23. | CSE | Dr K. Srinivas (PI), Dr. K. Suvarna Vani (Co-PI) | CSE | Qualitative And Quantitative Classification of Mixed Bamboo Forests Using Geospatial Technology | NESAC ISRO | Government | 25.30 | Sept 2021 | 3 Yrs. |
24. | ECE | Dr.Jasti Sateesh (PI) | ECE | Design and experimental validation of a novel AI-powered artificial pancreas | SERB-State University Research Excellence (SURE) | Government | 11.92 | Jan 2024 | 3 Years (2023-2026) |
25. | ECE | Dr.Naga Raghuram (PI) | ECE | Design and Characterization of SRAM-based Dosimeter | SERB- Teachers Associate ship for Research Excellence (TARE) | Government | 18.3 | May 2024 | 3 Years (2024-2027) |
26. | EEE | NIL | – | – | – | – | – | – | – |
27. | EIE | NIL | – | – | – | – | – | – | – |
28. | IT | Dr S Suhasini, Dr M Suneetha, Dr M Ramesh, Y Kalyan, S Balaji | IT | Development of Healthcare Management System | Avantel Ltd | Non-Government | 11,75,000/- | Mar 2023 | 15 Months |
29. | IT | Dr.J.Sateesh, Dr.G.Kalyani | IT | Design and experimental validation of a novel AI-powered artificial pancreas | Science and Engineering Research Board (SERB) DST | Government | 11,92,100/- | Jan 2024 | 03 Years |
30. | IT | Dr M Suneetha, Dr.V.Radhesyam, Dr.V.S.Sahithi | IT | Developing Efficient Local Scale Impact Evaluation tools using Geospatial System to Assess National Development Mission Outcomes and SDG Goals | National Remote Sensing Centre (NRSC-ISRO) | Government | 27,93,520/- | Sep 2022 | 03 Years |
31. | ME | Dr. V. Balakrishna Murthy, Dr. B Raghava Rao | ME | Design and FE analysis of a composite pressure vessel | Advanced systems laboratory Hyderabad | Government | 5 | 12/2023 | 5 months |
32. | ME | Dr A.V Ratna Prasad, Dr. V. Balakrishna Murthy, Dr. B Raghava Rao | ME | Design and development of Composite Tube | High energy materials research laboratory (HEMRL), Pune | Government | 9.97 | 01/2024 | 9 months |
33. | ME | Dr K.Nagamalleswara Rao | ME | Study Project on effect of temperature on thermo-physical properties of composite material using molecular dynamic simulation and experimental validation | DRDL Hyderabad | Government | 9.77 | 03/2024 | 11 months |
Sponsored Projects 2022-23
Sl. No. | Dept. | Name of the Principal Investigator/ Co-Investigator | Department of the Principal Investigator | Title of the Research Project | Name of the Funding Agency | Type (Government/Non-Government) | Funds provided (INR in lakhs) | Month and Year of receiving the grant | Duration of the Project |
---|---|---|---|---|---|---|---|---|---|
1 | CE | Dr. N. R. Krishnamurthy | CE | Soil Investigation for construction of new branch building at Chinnapuram Village of Krishna District | The Krishna District Co-operative Central Bank Limited | Non-Government | 0.59 | July 2022 | 2 months |
2 | CE | Dr. N. R. Krishnamurthy | CE | Soil Investigation for construction of new branch building at Katuru in Krishna District | The Krishna District Co-operative Central Bank Limited | Non-Government | 0.59 | July 2022 | 2 months |
3 | CE | Dr. K.S.R. Prasad | CE | Research and Investigation for the foundation of proposed ELSR (1800KL) at APTIDCO Houses, Gudivada | KMV Projects | Non-Government | 2.36 | May 2022 | 6 months |
4 | CE | Dr. K.S.R. Prasad | CE | Research and Investigation for the foundation of proposed ELSR (300KL) at APTIDCO Houses, Rudravaram, Machilipatnam Municipal area | KMV Projects | Non-Government | 1.89 | May 2022 | 6 months |
5 | CE | Dr. K.S.R. Prasad | CE | Research and Investigation for the foundation of proposed ELSR (200KL) at APTIDCO Houses, at Gosala near Ganganamma Temple, Machilipatnam Municipal area | KMV Projects | Non-Government | 1.68 | May 2022 | 6 months |
6 | CE | Dr. V. Mallikarjuna | CE | Subsoil investigation at Postal Department site for construction of HPO Building at Pulivendula vacant site under Proddutur Division of Andhra Pradesh – Postal Department, Kurnool | Postal Department | Government | 0.59 | May 2022 | 3 months |
7 | CE | Dr. V. Mallikarjuna | CE | Subsoil investigation at Postal Department site for construction of HPO Building at Gadwal vacant site under Mahabubnagar Division of Telangana State – Postal Department, Hyderabad | Postal Department | Government | 0.59 | October 2022 | 3 months |
8 | CE | Dr. V. Mallikarjuna | CE | Subsoil investigation at Postal Department site for construction of Small PO Building at Gopalpet Vacant Site under Wanaparthy Division of Telangana, Telangana State – Postal Department, Kurnool | Postal Department | Government | 0.41 | October 2022 | 4 months |
9 | CE | Dr. V. Mallikarjuna | CE | Subsoil investigation at Postal Department site for construction of Shed for locating BPC at Jeedimetla Postal Staff Quarters Premises, Hyderabad, Telangana State – Postal Department, Hyderabad | Postal Department | Government | 0.44 | October 2022 | 3 months |
10 | CE | Satish Sajja | CE | Investigation of soil characteristics, alternate materials and optimum pavement design for providing of BT Road at (4×270 Mw) Bhadradri thermal power station Manuguru Kothagudem district | KPC Project Limited | Non-Government | 0.50 | November 2022 | 2 months |
11 | CE | Dr. N. R. Krishnamurthy | CE | Soil testing for PG womens hostel (G+5) in Alluri Sitarama Raju Academy of medical Sciences, Eluru, Eluru District | Alluri Sitarama Raju educational Society | Non-Government | 0.73 | September 2022 | 3 months |
12 | CE | Dr. N. R. Krishnamurthy | CE | Pile testing for PEB structure medical college at Eluru | Andhra Pradesh Medical Services and Infrastructure Development Corporation Eluru Division | Government | 1.03 | July 2022 | 3 months |
13 | CE | Dr. V. Mallikarjuna | CE | Subsoil investigation for CPWD at ESI hospital, Gunadala, Vijayawada, Krishna District | CPWD | Government | 1.23 | January 2023 | 4 months |
14 | CE | Dr. V. Mallikarjuna | CE | Subsoil investigation at Postal Department site for construction of HPO Building at Razole, Dr. B.R. Ambedkar Konaseema District | Postal Department | Government | 0.59 | February 2023 | 1 month |
15 | CE | Dr. K. S. R Prasad | CE | Subsoil investigation and recommendations for the construction of bridge | M/S Anu Geotechnical investigation, Peravali | Non-Government | 0.24 | January 2023 | 1 month |
16 | CE | Dr. K. S. R Prasad | CE | Subsoil investigation and recommendations for the construction of tunnel for new B G line | M/S Avani Engineering Consultancy (P) Ltd., Hyderabad | Non-Government | 0.24 | January 2023 | 1 month |
17 | CE | Satish Sajja | CE | Soil investigation for proposed construction of PG girls hostel (G+5) in ASRAM, Eluru | ASRAM, Eluru | Non-Government | 0.81 | December 2022 | 2 months |
18 | CE | Dr. N. R. Krishnamurthy | CE | Technical Engineering Services in connection with construction of que line complex at back side of existing counters in the premises of Sri Venkateshwara Swamy vari devasthanam, Dwarka Tirumala AP | AP Endowment Department [Sri Venkateshwara Swamy vari devasthanam, Dwarka Tirumala AP] | Government | 1.53 | August 2022 | 3 months |
19 | CE | Dr. N. R. Krishnamurthy | CE | Engineering services and design CBR values for the proposed CC and BT Roads in MIG Jagananna Smart Township, Navuluru Village, Mangalgiri Mandal, AP | AP Public Health Department, Guntur | Government | 0.84 | August 2022 | 2 months |
20 | CE | Dr. N. R. Krishnamurthy | CE | Technical Engineering Services – Soil Investigation for the proposed Township in MIG Jagananna Smart Township, Navuluru Village, Mangalgiri Mandal, AP | AP Public Health Department, Guntur | Government | 0.47 | August 2022 | 2 months |
21 | CE | Dr. Chava Srinivas, Dr. Lakshmi Keshav, Dr. M Kanta Rao, Dr. K. Hanuma, Dr. P. Sri Ram Ravi Teja, Dr. Anuja Charpe | CE | Establishing centre of excellence in concrete R&D concrete 3D printer | KCP Limited | Non-Government | 28.0 | June 2023 | Ongoing |
22 | CSE | Dr S. Vasavi (PI), Dr M. Sobhana (Co-PI) | CSE | Updating Of Very Large-Scale Urban GIS Maps with Latest Very High-Resolution Satellite Data Using Deep Learning Techniques | NRSC: ISRO | Government | 17.85 | June 2022 | 2 Yrs. Sanctioned |
23 | CSE | Dr K. Srinivas (PI), Dr. K. Suvarna Vani (Co-PI) | CSE | Qualitative And Quantitative Classification of Mixed Bamboo Forests Using Geospatial Technology | NESAC: ISRO | Government | 25.30 | Sept 2021 | 3 Yrs. Ongoing |
24 | ECE | Dr.Aniruddh Bahadur Yadav (PI) | ECE | Fabrication and characterization of Novel Nanoscale Field Effect Transistors(FET) Array to detect VOCs for Breast cancer Screening | Board of Research in Nuclear Sciences (BRNS), Department of Atomic Energy (DAE) | Government | 24.75 | Sep 2022 | 3 Years (2022-2025) |
25 | EEE | Nil | – | – | – | – | – | – | – |
26 | EIE | Nil | – | – | – | – | – | – | – |
27 | IT | Dr S Suhasini, Dr M Suneetha, Dr M Ramesh, Y Kalyan, S Balaji | IT | Development of Healthcare Management System | Avantel Ltd | Non-Government | 11.75 | Mar 2023 | 15 Months |
28 | IT | Dr M Suneetha, Dr.V.Radhesyam, Dr.V.S.Sahithi | IT | Developing Efficient Local Scale Impact Evaluation tools using Geospatial System to Assess National Development Mission Outcomes and SDG Goals | National Remote Sensing Centre (NRSC-ISRO) | Government | 27.9352 | Sep 2022 | 03 Years |
29 | IT | Dr S Suhasini | IT | e-Health | Providence Software Solutions, Johannesburg, South Africa | Non-Government | 1.00 | Nov 2020 | 02 Years |
30 | ME | Dr. B Raghava Rao, Dr. V. Balakrishna Murthy | ME | Health Assessment of an Existing GFRP Composite Shell | NSTL, Visakhapatnam | Government | 16.93 | 03-2023 | 4 months |
31 | ME | Dr. V. Balakrishna Murthy, Dr. B Raghava Rao | ME | Design & Finite Element Analysis of Airworthy composite container | NSTL, Visakhapatnam | Government | 9.5 | 06-2023 | 11 months |
32 | ME | Dr N Ravi Kumar | ME | Design and Fabrication of non-axisymmetric VRTM Mould | Universal Engineering Technics, Hyderabad | Non-Government | 5.1 | 06-2023 | 3 months |